S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
114. The authorization holder must weld a ventilated steel cover at the top of the casings.
O.C. 1252-2018, s. 114.
In force: 2018-09-20
114. The authorization holder must weld a ventilated steel cover at the top of the casings.
O.C. 1252-2018, s. 114.